StereoFloss

McMorran Place - Live Music Venue in Michigan

McMorran Place is an entertainment complex in Port Huron, Michigan consisting of a 4,800-seat multi-purpose arena and a theater. It was designed by Alden B.

Venue
McMorran Place
Town
Michigan, US
Capacity
3,400

McMorran Place is an entertainment complex in Port Huron, Michigan consisting of a 4,800-seat multi-purpose arena and a theater. It was designed by Alden B. Dow and built in 1960 for $3.5 million (equivalent to $38.1 million in 2025). The exterior of the complex is faced with red brick with limestone accents. As of the 2015-16 season, McMorran has been the home of the Port Huron Prowlers of the Federal Prospects Hockey League. Previous hockey tenants include the Port Huron Flags (various incarnations), Port Huron Wings, Port Huron Border Cats, Port Huron Beacons, Port Huron IceHawks, and Port Huron Fighting Falcons. The arena seats 2,200 for ice hockey and indoor football, and 4,800 for concerts. The arena floor measures 85 by 185 feet (26 by 56 m). The dasher boards have 8-foot (2.4 m) glass on the ends and 4-foot (1.2 m) glass on the sides for ice hockey. The arena is also used for conventions, circuses, ice shows, trade shows, and banquets, among other events. The arena has hosted many major headlining musicians throughout the years such as Kiss, Aerosmith, Ted Nugent, Van Halen, Bon Jovi, Rush, Ozzy Osbourne, Johnny Cash. The 1998 opening of RBC Centre in Sarnia, Ontario sent most of the arena's concert business across the St. Clair River, which separates Port Huron from Sarnia. However, in 2010 McMorran started to rejuvenate its concert lineup with the band Third Eye Blind. In 2012, McMorran Arena and the adjacent pavilion were used for the Devil's Asylum haunted house. As a result, the Fighting Falcons began their season on the road. In November 2019, the arena received a donation of 3,000 seats from the shuttered Palace of Auburn Hills. Although the seats were free, the city had to bear the cost to move and install them. The city planned to remove the original wooden seats and have the new padded seats in place by summer 2020. The seats were one of several upgrades to the facility which included work on sound and electrical equipment in the theatre, carpeting